Charge points can be assigned priorities individually. Together these priorities dictate how energy is distributed within the infrastructure.
Make sure that the clusters are configured correctly according to this guide. and that all required charging stations are visible by the OCCP prox.
Instruction | ||
---|---|---|
1. Navigate to the FLEXeCHARGE Smart Charging Platform, login with your information and click on the "Infrastructures" page on the left. Find the infrastrucutre with the charging stations and click "Charging Stations" in the top bar. This will show you all associated chargepoints. |
||
2.To change priortization of a charge point click the dropdown in the "priority column" of an individual charge point.
The available settings are. Normal, Medium and High. The highest priority charge point will receive the maximum current possible. And charge points with lower priorities will receive the remaining available charge current. Charge current is allocated in a waterfall from High to normal prioritization. Note: If two or more chargers share the same priority, the possible current will be distributed on equal share policy. | ||
3. Repeat this step for all charging stations in the infrastructure. | ||
Static prioritization is configured for the infrastructure, and charging will follow the assigned priorities. However, adaptive charging is not configured yet and is highly recommended as it actively monitors charging to optimize it. Follow this guide to setup adaptive charging.
🔗
Adaptive Charging Setup